Date: 2008 Client: Ethiopian Electric Power Corporation Supply and delivery of a complete transmission line, including conductors, wires, steel towers, insulators, fittings, OPGW, and shield wires 30 kV Meika Wakena - Ramo transmission in 230 kV Ramo-Gode transmission line materials 132KV power transmission between Harar and Fik